Mitsubishi Eclipse Workshop Manual page 526

Hide thumbs Also See for Eclipse:
Table of Contents

Advertisement

37A-18
STEERING
-
Power Steering Gear Box
POWER STEERING GEAR BOX
REMOVAL
AND
INSTALLATION
Pre-removal Operation
oDraining
of
the
Power Steering
Fluid
.Removal of
Transfer
(Refer
to
GROUP
22
-
Transfer.)
<4WD>
Post-installation
Operation
.lnstallation
of
Transfer
(Refer
to
GROUP
22
-
Transfer.)
<4WD>
oSupplying
or the
Power
Steering
Fluid
oBleeding
of
the
Power Steering
Fluid
Line
(Refer
to
P.37A-10.)
oChecking of
Steering
Wheel
Position
with
Wheels Straight
Ahead
oAdjustment
of
the
Front
Wheel
A[gn-
ment
(Refer
to
GROUP
33A
-
Service
Adjustment
Procedures.)
Removal
steps
1.
Joint assembly and gear box connecting
bolt
2. Connection
for
return hose
3. Connection
for
pressure hose
4.
Split pin
5.
Tie+od end
and knuckle connecting
nuts
ef
6. Tie-rod end
7. Stay
8.
Stabilizer
bar bracket
9. Front roll stopper mounting bolt
10.
Center member rear
mounting
bolt
1 1
. Front exhaust
pipe
(2WD)
(Refer
to
GROUP
33A
-
Stabilizer
bar.)
.r ..
12. Gear box assembly
|.
13. Mounting rubber
70]tlm
7.O
lqm
51 ft.lbs.
45
Nm
15
Nm
18
Nm
1.8 kgm
13 ft.lbs.
58
Nm
5.8
kgm
42
ft.lbc"
.fu
9
36
Nm
3.6 kgm
25 ft.lbs.
13
Nm
1.3
kgm
9
ft.tb.
4.5
kgm
33 ft.lbr.
13AO276
12
Nm
1.2 kgm
I
ft.rb.
1.5 kgm
11
frlbs
O',
_-4;^'
(
--
2.9lrgrn
4E
21 ft.lbs.
@
tlitrublshi
i,lotors
Corporation
Apr.
1991
Pl,vt E90ro
r3Aqt53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents