Mitsubishi Eclipse Workshop Manual page 35

Hide thumbs Also See for Eclipse:
Table of Contents

Advertisement

ENGINE
-
Oil
Pan
and Oil
Screen
1
1-13
o
o
OIL
PAN
REMOVAL
{}}a
AND
OIL
SCREEN
AND
INSTALT.ATION
ET
1(A.A
Sealant: MITSUBISHI GENUINE
PART
No. MD97O389
or equivalent
Pre-removal
and
Post-installation
Operation
oDraining and
Refilling
of
Engine
Oil
(Refer
to
GROUP 12
-Service
Adjusr-
ment
Procedures.)
N8
7
Nm
kgrn
ft.lbs.
45
Nm
4.5
kgm
33 ft.lbs.
o
o
Removal stepe
1.
Drain plug
2. Self locking
nut
3.
Centermember
4. Connection for
exhaust pipe
5.
Gasket
6. Oil
pan
7. Oil
screen
8.
Gasket
5IU
58 Nmr
5.8 kgm*
42 ft.lb6.r
9.0 kgm
55 ft.lbs.
NOTE
For
tightening
locations indicated by
the
*
symbol,
first
tighten temporarily, and
then
make
the
final tightening
with the
entire
weight
of the
engine applied
to
the
vehicle
body.
3.5
25
a
o
Ii
C Uiu,rtlO*
Motor
Canpontion
July
1992
FN'UESIGA

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents