Mitsubishi Eclipse Workshop Manual page 343

Hide thumbs Also See for Eclipse:
Table of Contents

Advertisement

POWER PLANT MOUNT
-
Ensine Roil Stopper
32-5
O
a
ENGINE ROLL
STOPPER
REMOVAL
AND
INSTALLATION
Pre-removal Operation
oRaise
and
Suspend
the
Engine
to
the
Extent
Force
is
hot
applied
to-the
Engine
Mount
Post-installation Operation
oLower
the
Engine
<4WD>
45
Nm
4.5
kgm
33 ft.lbs.
58 Nm'
5.8
kgm'
42
ft.lbs.'
Front rol!
stopper bracket removal steps
1.
Front
roll
stopper bracket
and
engine
connection
bolt
2.
Front
roll
stopper bracket installation bolts
|a
3.
Front
rollstopper bracket
Rear
roll stopper bracket removal steps
4.
Rear
rollstopper bracket
and
engine
connection bolt
5.
Rear roll
stopper bracket installation
bolts
6.
Rear roll
stopper bracket
45
Nm
4.5
kgm
33 ft.lbs.
<2WD>
45
Nm
4.5
kgm
33
ft.rb.
2
58 Nm*
5.8 kgm*
42 ft.lbc.'
\
rNl
LV
t\
I
o
("
,\/_
\.<-
45
Nm
4.5 kgm
33 ft.lbr.
I
I
l"'-
e=
58
Nm
5.8lgm
42
ft.lbs.
NOTE
*
Indicates
parts
which should be
temporarily tiqhtened.
and
then,fully tightened
with the
weilht of
tnö
enginC
supported
by
the
body.
INSPECTION
o
Check each
o
Check each
insulator .for cracks
or
damage.
bracket
for
deformation
or
dämage.
)
fp
"'*,t*l
naoocoteorroon
Apr.
resl
PWUEgOTO

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents