The module check begins with connecting the supply voltage to the PDA.
If the current consumption differs a great deal from the normal limits,
proceed to the Power–On check.
If current consumption is OK, the service software should connect to the
PDA. If the target PDA does not respond to the pings from the host,
check the Power–On procedure.
When the PDA responds further tests may be carried out; the execution
order is not significant and it may be changed.
After all the functional tests are working, the device under test should be
re–booted, and the normal usability of the GEOS, along with the CMT
module should be checked before the PDA can be considered to be fully
functional.