Mitsubishi Electric Mr.SLIM PUHZ-RP1.6VHA Technical & Service Manual page 93

Split-type, heat pump air conditioners
Hide thumbs Also See for Mr.SLIM PUHZ-RP1.6VHA:
Table of Contents

Advertisement

OPERATING PROCEDURE
7. Removing the solenoid valve coil <Four-way valve> (21S4),
and linear expansion valve coil (LEV(A), LEV(B))
(1) Remove the service panel. (See figure 1.)
(2) Remove the top panel. (See figure 1.)
[Removing the solenoid valve coil <Four-way valve>]
(3) Remove four-way valve solenoid coil fixing screw
(M4
6).
(4) Remove the solenoid valve coil <Four-way valve> by
sliding the coil toward you.
(5) Disconnect the connector 21S4 (green) on the controller
circuit board in the electrical parts box.
[Removing the linear expansion valve coil]
(3) Remove the linear expansion valve coil by sliding the coil
upward.
(4) Disconnect the connectors, LEV A (white) and LEV B (red),
on the controller circuit board in the electrical parts box.
8. Removing the four-way valve
(1) Remove the service panel. (See figure 1.)
(2) Remove the top panel. (See figure 1.)
(3) Remove 3 valve bed fixing screws (4
valve and stop valve fixing screws (5
remove the valve bed.
(4) Remove 4 right side panel fixing screw (5
rear of the unit and then remove the right side panel.
(5) Remove the solenoid valve coil <Four-way valve>.
(See photo 7.)
(6) Collect the refrigerant.
(7) Remove the welded part of four-way valve.
Note 1: Collect refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by remov-
ing the right side panel.
Note 3: When installing the four-way valve, cover it with a
wet cloth to prevent it from heating (120°C or more),
then braze the pipes so that the inside of pipes
are not oxidized.
9. Removing linear expansion valve
(1) Remove the service panel. (See figure 1.)
(2) Remove the top panel. (See figure 1.)
(3) Remove 3 valve bed fixing screws (4
valve and stop valve fixing screws (5
remove the valve bed.
(4) Remove 4 right side panel fixing screw (5
rear of the unit and then remove the right side panel.
(5) Remove the linear expansion valve. (See photo 7.)
(6) Collect the refrigerant.
(7) Remove the welded part of linear expansion valve.
Note 1: Collect refrigerant without spreading it in the air.
Note 2: The welded part can be removed easily by remov-
ing the right side panel.
Note 3: When installing the linear expansion valve, cover
it with a wet cloth to prevent it from heating
(120°C or more), then braze the pipes so that the
inside of pip-es are not oxidized.
Photo 7
Linear expansion
valve coil (LEV B)
Photo 8
10) and 4 ball
16) and then
10) in the
Linear
expansion
valve coil
(LEV B)
10) and 4 ball
16) and then
10) in the
Linear expansion
valve
93
PHOTOS
Linear expansion
valve coil (LEV A)
Solenoid
valve coil
<Four-way valve>
fixing screw
Solenoid
valve coil
<Bypass valve>
(SV)
Solenoid
valve coil
<Four-way valve>
(21S4)
Linear expansion
valve coil (LEV A)
Charge plug
(Low pressure)
Charge plug
(High pressure)
Four-way
valve
Linear
expansion
valve
Four-way
valve

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents