8.2.5 Site Survey
After the Site Survey
8-26
DECT Portable Station Section
After obtaining the proper measurement results, the following pro-
cedures are required before mounting the Cell Station to the wall.
1. Disconnect the AC adaptor.
2. Switch the Radio Signal Test Switch of the Cell Station from
ON to OFF.
ON
OFF
1
2
3. Connect the cable from the 2-RF Interface Unit with the 4-
Station Line to the Cell Station, and pass the cord through the
groove on the unit.
Radio Signal Test Switch
3
4
5
6