EAS24350
CYLINDER AND PISTON (YP250R)
Removing the cylinder and piston
3
E
LS
7 Nm (0.7 m
Order
Cylinder head
1
Water pump outlet pipe
2
Timing chain guide (exhaust side)
3
Cylinder
4
Cylinder gasket
5
Dowel pin
6
Clip
7
Piston pin
8
Piston
9
Top ring
10
2nd ring
11
Oil ring
4
New
5
11
10
New
9
1
LS
New
kgf, 5.1 ft
Ibf)
•
•
Job/Parts to remove
CYLINDER AND PISTON (YP250R)
6
New
8
7
E
E
Q'ty
Refer to "CYLINDER HEAD (YP250R)" on
page 5-67.
1
1
1
1
2
2
1
1
1
1
1
For installation, reverse the removal proce-
dure.
5-84
2
6
New
Remarks