Mitsubishi Electric Q173CPU Programming Manual page 357

Q series motion controller
Hide thumbs Also See for Q173CPU:
Table of Contents

Advertisement

11 MOTION SFC PARAMETER
(3) NMI task operation
[Operations]
The Motion SFC program is executed when the input set to the NMI task factor
among external interrupts (16 points of QI60) turns on.
PLC program
External interrupts
NMI task
END operation: End
END operation: Continue
Do not execute a
program before the
NMI task starting.
(Note) : When making it
always execute,
set as automatic
start.
[Points]
(a) NMI task has the highest priority among the normal, event and NMI tasks.
(b) If the event task is disabled (DI) by the normal task, the interruption of the
NMI task is executed, without being masked.
[Errors]
The motion control step is executed during NMI task.
If the motion control step is executed during NMI task, the Motion SFC program
error [16113] occurs and stops the Motion SFC program.
Program name
F20
F1
F2
F3
F4
END
SFCS
1)
2)
1)
2)
Execute the number of
consecutive transition for
every NMI task occurrence.
11 - 6
1)
2)
3)
3)
3)
1)
When END operation is set as
continuation, continuation
operation is executed.
When stopping, it is make to
execute CLR by other programs.
2)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Q173cpunQ172cpuQ172cpun

Table of Contents