4.0 SITE LOCATION AND PREPARATION

4.1 Site Location.


The boiler is heavy. Care must be taken when lifting the boiler
For access purposes, the modules can be split and reassembled in the plant room

The floor or plinth for the boilers and pipe work kit must be both flat and level to ensure

correct alignment of fittings and connections.
The floor or plinth must be sufficiently strong to support the weight of both the boilers

and pipe work kit where used.
The floor or plinth must be fireproof in accordance with BS 6644.

The plant room must have sufficient space for installation of boilers, pipe work, pumps

controls, flues ventilation, access and servicing and other items of plant.

4.2 Gas Supply.


Gas supply pipes must be in accordance with BS 6891 or IGE/UP/2

Gas supply connections to the boiler must not be smaller than the connection on the
boiler - refer to Figure 4.2 & Appendix 2 for the connection size.

Gas installation must be soundness tested to BS 6891 or IGE/UP/1 & IGE/UP/1A.

Gas installation must be purged to BS 6891 or IGE/UP/1 & IGE/UP/1A.

Inlet gas pressure to boiler measured at the gas valve, nominal 20mbar (minimum
17.5mbar) dynamic - refer to Appendix A

Boiler house gas isolation valve must be clearly identified and installed close to the
entrance / exit.
Gas connection
Figure 4.2 - Gas Connection Point
HAMWORTHY HEATING LTD
7
FLEET V series
500001213/G

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

F50vF70vF85vF100vF125vF150v ... Show all

Table of Contents