Chrysler PT Cruiser Service & Repair Manual page 108

Hide thumbs Also See for PT Cruiser:
Table of Contents

Advertisement

3 - 20
HALF SHAFT
CV BOOT - OUTER (Continued)
Fig. 52 Crimping Tool Installed on Sealing Boot
1 - SPECIAL TOOL C-4975A
2 - INTERCONNECTING SHAFT
3 - CLAMP
4 - SEALING BOOT
Fig. 53 Sealing Boot Retaining Clamp Installed
1 - CLAMP
2 - JAWS OF SPECIAL TOOL C-4975A MUST BE CLOSED
COMPLETELY TOGETHER HERE
3 - INTERCONNECTING SHAFT
4 - SEALING BOOT
sealing boot to outer C/V joint retaining clamp evenly
on sealing boot.
(9) Clamp sealing boot onto outer C/V joint hous-
ing using Crimper, Special Tool C-4975-A and the fol-
lowing procedure. Place crimping tool C-4975-A over
bridge of clamp (Fig. 54). Tighten nut on crimping
tool C-4975-A until jaws on tool are closed completely
together, face to face (Fig. 55).
Clamp
Fig. 54 Crimping Tool Installed on Sealing Boot
1 - CLAMP
2 - TRIPOD JOINT HOUSING
3 - SPECIAL TOOL C-4975A
4 - SEALING BOOT
Fig. 55 Sealing Boot Retaining Clamp Installed
1 - CLAMP
2 - TRIPOD HOUSING
3 - SPECIAL TOOL C-4975A
4 - JAWS OF SPECIAL TOOL C-4975A MUST BE CLOSED
COMPLETELY TOGETHER HERE
5 - SEALING BOOT
(10) Install the halfshaft requiring boot replace-
ment back on the vehicle. (Refer to 3 - DIFFEREN-
TIAL
&
DRIVELINE/HALF
INSTALLATION)
Clamp
SHAFT
PT
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents