Dell PowerEdge M1000e Getting Started Manual page 5

Dell poweredge blade servers getting started guide
Hide thumbs Also See for PowerEdge M1000e:
Table of Contents

Advertisement

Figure 4. Installing a Half-Height Blade
NOTE: The above figure shows installation of a half-height blade. The procedure for installing a full-height blade is
identical to installing a half-height blade.
Beginning at the top, slide the blades into the enclosure from left to right. When the blade is securely installed, the blade
handle returns to the closed position.
Connecting The CMC And iKVM Modules
Figure 5. Connecting the Modules
Connect the serial cable and network cable(s) from the management system to the CMC module. If a second optional
CMC module is installed, connect it as well.
Connect the keyboard, mouse, and monitor to the optional iKVM module.
5

Advertisement

Table of Contents
loading

Table of Contents