The following illustration shows the location of the power-supply connector
on a Remote Supervisor Adapter II installed in a rack-mounted server.
Power-supply
adapter cable
4. Connect one end of the power cord to the connector on the power-supply
adapter.
5. Connect the other end of the power cord to a properly grounded electrical
outlet.
Note: You can connect one end of the universal power cord to the
power-supply adapter; then, connect the other end to a power
distribution unit (PDU) or to an uninterruptible power supply.
6. Check that the Remote Supervisor Adapter II power LED is lit, to verify
that there is power to the Remote Supervisor Adapter II. For the location of
the power LED, see the illustration in "Cabling the Ethernet LAN
connector" on page 15.
7. Connect the power cords to the server and turn on the server.
8. Return to step 17 on page 13..
18
Remote Supervisor Adapter II: Installation Guide
Power-supply adapter
Power cord
Remote Supervisor Adapter
external power-supply
connector

Advertisement

Table of Contents
loading

Table of Contents