Download  Print this page

Advertisement

Table of Contents
Cable, Wire, and Hose Routing
Korea, Germany, France, Italy, United Kingdom, Switzerland, Austria and Netherlands Models
1. Clamp
2. Direction of the clamp.
Notice it differs from that of right side.
3. Clamp
4. Coolant Filter
5. Coolant Filter Housing (Set the coolant filter housing parallel to the outer side of the frame.)
6. Band
7. Clamp
8. Coolant Hose
9. Fitting
10. Clamps
11. Clamp
12. Coolant Hose
13. Clamp
14. Radiator Pipe (Left)
15. Coolant Hose
16. Install the hose of U-shaped side shown as illustrated.
17. Run the hose between the right carburetor boot and the left one.
18. Fit the flat part of the damper on the crankcase.
19. Direction of the clamp. Notice it differs from that of left side.
20. Radiator Pipe (Right)
21. Clamp
22. Coolant Hose
23. Clamp
24. Damper
25. Coolant Valve
26. Clamp
27. Set the hose with its white-painted mark located at the rear.
28. Radiator Hose
29. Fitting Pipe
30. Clamps
31. Radiator Hose
32. Clamp
33. Coolant Hose
34. Clamp
35. Set the clamp parallel to the inner side of the frame.
36. Direction of the clamp is same as left side and right side.
37. Direction of the clamp. Notice it differs from that of left side.
A: On and after EN500-C8.
APPENDIX 16-11

Advertisement

Table of Contents

   Also See for Kawasaki EN500 Vulcan 500 LTD

This manual is also suitable for:

Vulcan 500 ltd

Comments to this Manuals

Symbols: 0
Latest comments:
  • Ricardo Paluan Apr 27, 2016 01:22:
    Adquiri recentemen​te uma moto vulcan 500 ano 1995. Tenho o 37 anos e iniciante no mundo motociclis​ta. Entretanto​, em razão só tempo e idade da moto, não tenho o manual do proprietá​rio, sendo este indispens