Surround Assembly; Double Door Installation - Jøtul Direct Vent Gas Fireplace GZ550s Installation And Operation Instructions Manual

Direct vent gas fireplace
Table of Contents

Advertisement

Surround Assembly

1. Install the Lower Grill / Control Door.
• Secure the hinges to the cabinet frame using
the hex head screws provided in the hardware
bag. Fig. 44.
2. Install each of the Side castings onto the
cabinet by engaging the hanger tabs with the
holes in the cabinet frame. See Fig. 52 for
orientation.
3. Install the Right and Left Upper Grill plates.
4. Attach the Inner Panel to the Center Plate. The Inner
Panel may be reversed to show the winter scene.
(Note: Blue Black Panel is enamelled on one side only).
5. Hang the Center Plate in position.
Optional Double Door
The Double Door set is fully assembled and requires
no tools for installation. Use the 4 mm hex key
supplied with the doors to adjust the door alignment
at the eight socket head hinge screws.
Door Installation
Unpack the door set and inspect the parts for
damage. Notify your dealer if any damage is found.
You may wish to remove the doors from the
frame to lighten the assembly and ease installation.
They simply lift off of the hinges.
The door assembly attaches to the fireplace by
engaging the three slots in the upper frame with the
corresponding steel tabs at the top of the firebox.
See Fig. 45.
A dimple located on the inside of the frame at
each lower corner engages with corresponding holes
in the glass frame to hold the bottom of the door
assembly securely to the firebox. See A, Fig. 46.
1. Open the Control Access Door. Hang the door
frame onto the firebox by engaging the tabs with
the holes in the frames. See Fig. 45.
2. Push the frame over to one side and engage the
dimple on that lower corner with the hole in the
side of the glass frame. You will feel it lock into
place.
3. Push the frame assembly over to the opposite side
and push that lower corner down to engage with
the firebox.
Door Alignment Adjustment
You can adjust the door alignment if necessary by
loosening the hinge screws (See B, Fig. 46 and Fig.
Figure 44. Install the Lower Grill / Control Door.
Figure 45. Hang the frame on the cabinet.
B
B
A
A
Figure 46. Rear view of door frame.
Loosen
screws to
adjust
door
alignment
Figure 47. Door adjustment points.
Page 21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gz 550 dv acadia

Table of Contents