Yamaha 2008 Fazer FZ1-N Service Manual page 93

2008 motorcycle
Hide thumbs Also See for 2008 Fazer FZ1-N:
Table of Contents

Advertisement

FZ1-NA
1. Throttle cables
2. Radiator inlet hose
3. Brake fluid reservoir hose
4. ABS breather hose
5. EXUP cable wire bending attachment
6. EXUP cable
7. Fuel tank breather hose
8. Rear brake light switch lead
9. Rear wheel sensor lead
10.Radiator fan motor lead (right)
11.Coolant reservoir tank hose
12.Wire harness
13.Right handlebar switch lead
14.Clutch cable
15.Radiator stay
16.Throttle cable (return side)
17.Throttle cable (pull side)
18.Frame
19.Rear brake light switch stay
20.Footrest bracket (right)
21.Rear brake light switch
22.Rectifier/regulator lead
23.AC magneto lead
A. To the throttle bodies
B. Clamp the coolant reservoir hose and inlet
hose. Point the clamp opening to the out-
side of the vehicle and the tip of the clamp
to the front upper side of the vehicle, and
pay attention so that the tip does not pro-
trude from the radiator cover.
C. Clamp the AC magneto lead and rectifier/
regulator lead. Point the clamp opening to
upward.
D. To the EXUP
E. Route the fuel tank breather hose and ABS
breather hose through the wire guide.
White paint mark on the hose should be
lower than the wire guide.
F. Route the AC magneto lead and rectifier/
regulator lead in front of the wire guide.
G. Route the fuel tank breather hose, ABS
breather hose and EXUP cable through the
wire guide of the rear brake light switch
stay.
H. Clamping position should be above the
wire guide of the rear brake light switch.
I. Clamping position should be placed by the
inner side of the back stay tightening sec-
tion.
J. Tighten the rear brake ground lead
together with the hydraulic unit. Tighten the
terminals so that the leads are routed
through the shortest distance.
K. Bind the two EXUP cables with the clamp.
A part of the clamp should be located
within 10 mm (0.39 in) from the edge of
wire bending attachment. Clamp opening
can be facing in any direction.
L. 0–10 mm (0–0.39 in)
M. To the wire harness
N. To the coolant reservoir tank
O. Route the radiator fan motor lead (right) so
that there is no slack as much as possible
in this section.
P. Route the radiator fan motor lead (right)
above the coolant reservoir hose and route
it to the inside of the frame.
Q. Route the coolant reservoir hose to the
inner side of the radiator inlet hose and
then route it to the lower outside of the
thermostat assembly.
R. Route the clutch cable through the concav-
ity (concave) section of the radiator stay.
S. Outside of the vehicle.
T. Can be routed in any order.
U. Clamp all the leads. Point the end of the
clamp toward outside and cut off the
excess end of the clamp to 2–4 mm (0.08–
0.16 in). When inserting the band, point the
end toward front of the vehicle.
V. Route the AC magneto lead and rectifier/
regulator lead in front of the EXUP cable.
W. Inside of the vehicle.
X. Front of the vehicle.
Y. Point the clamp head toward outside and
the end should be placed at the front of the
vehicle.
2-48
CABLE ROUTING

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents