Preparing For Installation; Unpacking And Inspecting The Module; Equipment And Tools Needed - Cisco Prisma II Hybrid Amplifier Installation Manual

Hybrid amplifier
Table of Contents

Advertisement

Chapter 2 Module Installation

Preparing for Installation

Before you begin, make sure that the module is in good condition and that you have
the tools and equipment listed here.

Unpacking and Inspecting the Module

As you unpack the module, inspect it for shipping damage. Inspect the rear
connectors for bent pins.
If you find any damage, contact Cisco Services.

Equipment and Tools Needed

You need the following equipment and tools to install these modules.
You need . . .
a Prisma II Chassis with power supply
3/8-in. flat-blade screwdriver
optical cables with connectors
optical cleaning materials
optical power meter
10
To . . .
provide housing, power, and input/output
connections to the module.
secure the module in the chassis.
carry optical input and output signals.
clean optical connectors.
verify optical input and output levels.
78-4025693-01 Rev D

Advertisement

Table of Contents
loading

This manual is also suitable for:

Prisma ii

Table of Contents