FINAL GEAR
Order
Job name/Part name
Disassembling the final gear.
1
Bolts (bearing housing)
2
Nuts (bearing housing)
3
Bearing housing/O-ring
4
Ring gear
5
Shim (s)
6
Thrust washer
23 Nm (2.3 mSkg)
40 Nm (4.0 mSkg)
Q'ty
2
6
1/1
1
1
1
6-80
SHAFT DRIVE
Remarks
Disassemble the parts in the order listed.
NOTE:
Working in a crisscross pattern, loosen
each bolt and nut 1/4 of a turn. After all
the bolts and nuts are loosened, remove
them.
For assembly, reverse the disassembly
procedure.
CHAS