9.7.
Pump down
• To enable pump down operation, at outdoor PCB, set the DS1 to OFF position.
• Press Test Run button for 1 second.
• During Pump Down operation, push the Test Run button again for 1 second to stop the pump down operation.
• The pump down operation run for 10 minutes.
35