Final Drive - Installing - BMW K75 Repair Manual

All 2v models
Hide thumbs Also See for K75:
Table of Contents

Advertisement

23-24.0
Coat the splines on the drive shaft with "Staburags".
Insertthe drive shaft
in
the swinging arm and push it over
the splines.
The
snap ring
must
be
heard
to engage.
Run
the
clutch cable
through
the gear
housing.
Push
up
the clutch withdrawallever
by hand
and attach
the clutch cable.
Final drive-
installing
Coatthe final drive pinion splines
with
"Staburags".
Secure the final drive to the rear swinging
arm
with the
four retaining bolts (arrows).
Tightening torque:
Final drive
10 swing
ing
arm
40 ±3Nm
Install the spring strut:
Install the
spring
strut with the preload bushing
at
the top.
Tightening torques:
Spring strut to frame
Spring strut 10 final drive
51
±3Nm
51
±3Nm
Attach the coolant
equalizing tank
to
the mounting on the
battery baseplale.
Battery
-
installing
Screw
the
positive cable
(2)
to
the positive post
on
the
battery.
Screwthe negative
cable (1) to
the
gearbox.
Gently screw
on the battery holder
with
two
retaining
screws
(arrow)
.
Note:
The
cooling equalizing
tank is retained
securely at
the
same time.
8.87

Advertisement

Table of Contents
loading

This manual is also suitable for:

K100 lt

Table of Contents