Epoxy Chocks Arrangement; Arrangement Of Epoxy Chocks And Holding Down Bolts - Man B&W S80ME-C7 Project Manual

Electronically controlled two-stroke engines
Table of Contents

Advertisement

MAN B&W

Epoxy Chocks Arrangement

For details of chocks and bolts see special drawings.
For securing of supporting chocks see special
drawing.
This drawing may, subject to the written consent of
the actual engine builder concerned, be used as a
basis for markingoff and drilling the holes for hold-
ing down bolts in the top plates, provided that:
Fig. 5.12.01: Arrangement of epoxy chocks and holding down bolts
MAN B&W S80MC-C/ME-C6/7/8
) The engine builder drills the holes for holding
down bolts in the bedplate while observing the
toleranced locations indicated on MAN B&W
drawings for machining the bedplate
2) The shipyard drills the holes for holding down
bolts in the top plates while observing the toler-
anced locations given on the present drawing
3) The holding down bolts are made in accord-
ance with MAN B&W drawings of these bolts.
MAN Diesel
5.12
Page  of 3
178 57 39-7.0
198 41 82-4.1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents