PERIODIC MAI N TENANCE 2-15
ENGINE IDLE SPEED
lnspect initially at 1 000 km (600 miles, 2 month) and
every 6 000 km (4 000 miles, 12 months) thereafter.
NOTE:
Make this adjustment when the engine is hot.
Start up the engine and set its idle speed to the specified
range by turning the throttle stop screw
a.
Engine idle speed: 1 300
*
100 rlmin
THROTTLE CABLE PLAY
lnspect initially at 1 000 km (600 miles, 2 month) and
every 6 000 km (4 000 miles, 12 months) thereafter.
Adjust the throttle cable play
@
with the following three steps.
MINOR ADJUSTMENT
First step:
Remove the cable adjuster covers
a.
Loosen the lock-nut
@
of the throttle returning cable
@
and
turn in the adjuster
@
fully into the threads.
Second step:
Loosen the lock-nut
@
of the throttle pulling cable
@.
Turn the adjuster
in or out until the throttle cable play
@
should be 2.0
-
4.0
mm
(0.08
-
0.16 in) at the throttle grip.
Tighten the lock-nut
@
while holding the adjuster
O.
Third step:
While holding the throttle grip at the fully closed position,
slowly turn out the adjuster
@
of the throttle returning cable
@
to feel resistance.
Tighten the lock-nut
@
while holding the adjuster
@.
Throttle cable play
@:
2.0
-
4.0 mm (0.08
-
0.16 in)
After the adjustment is completed, check that handle-
bar movement does not raise the engine idle speed
and that the throttle grip returns smoothly and auto-
NOTE:
Major adjustment can be made by the throttle body side
adjuster.