Toshiba MW27FN1 Service Manual page 29

Color television/ video cassette recorder/ dvd video player
Hide thumbs Also See for MW27FN1:
Table of Contents

Advertisement

2-14: CAPSTAN DD UNIT (Refer to Fig. 2-14-A)
1.
Remove the Capstan Belt.
Remove the 3 screws 1.
2.
3.
Remove the Capstan DD Unit.
1
1 1
• Screw Torque: 4 ± 0.5kgf•cm
NOTE
1. In case of the Capstan DD Unit installation, apply the
silicon bond (TSE3843-W) on the position Fig. 2-14-B
correctly. (If no silicon bond applied, abnormal noise will
be heard on the deck operation.)
(Refer to Fig. 2-14-B, C)
Applied position of
silicon bond
Be careful not to apply the silicon
bond to the Pinch Roller.
Capstan DD Unit
DISASSEMBLY INSTRUCTIONS
Capstan Belt
Capstan DD Unit
Fig. 2-14-A
Fig. 2-14-B
Silicon Bond
Main Chassis
Fig. 2-14-C
2-15: MAIN CAM/PINCH ROLLER CAM/JOINT GEAR
(Refer to Fig. 2-15-A)
Remove the E-Ring 1, then remove the Main Cam.
1.
Remove the E-Ring 2, then remove the Pinch Roller
2.
Cam and Joint Gear.
NOTE
1. In case of the Pinch Roller Cam and Main Cam installa-
tion, install them as the circled section of Fig. 2-15-B so
that the each markers are met. (Refer to Fig. 2-15-B)
And also can be seen the Main Chassis hole through the
Main Cam maker hole.
Pinch Roller Cam
Marker
Main Cam
2-16: LOADING GEAR S/T UNIT (Refer to Fig. 2-16-A)
Remove the E-Ring 1 and remove the Main Loading
1.
Gear.
2.
Remove the Main Rod, Tension Lever, Loading Arm S
Unit and Loading Arm T Unit.
Main Rod
Tension Lever
B2-5
1
Main Cam
2
Pinch Roller Cam
Joint Gear
Fig. 2-15-A
Fig. 2-15-B
1
Main Loading Gear
Loading Arm T Unit
Loading Arm S Unit
Fig. 2-16-A

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mw27fn1c

Table of Contents