Preparation Before Operation - Mitsubishi Electric Freqrol Z024-UL Instruction Manual

Vvvf transistor inverter
Table of Contents

Advertisement

3. PreDaration before Operation
1.
Unpacking and Checking the Product
After unpackina the inverter, check the
rating plate at-the right side of the in-
verter to make sure that the model and
rating meet your order. Also check that
the inverter has not been damaged.
.
Accessories, Instruction Manual
n
2.
Preparation of Apparatus and Compo-
nents Needed for Operation
Apparatus and Components to be pre-
pared differ depending on how you oper-
ate the
inverter.
Prepare necessary
components referring to operation meth-
ods on page 13.
(Next page)
Applicable motor
capacity
1
INVERTER
Type
MlTSUBlSHl
7
MODEL
FR-2024-0.75K-UL
Input
POWER
1
HP
AC INPUT
3HP 2OOV-230V 50/60Hz
OUTPUT
5A
max 200-230V
SERIAL
0151
TC100A08 1 0 5 1
output
ratina
1
AMITSUBISHI
ELECTRIC CORPORATION
MADE I N J A P ~ N
I 3
-11
-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents