Installing The Celeron Processor; Installing The Retention Mechanism - Acer Power 6100 User Manual

Table of Contents

Advertisement

4.5.3

Installing the Celeron Processor

Before you proceed, make sure that there is no processor installed in the CPU connector.
Follow these steps to install a Celeron processor:
1. Place the retention mechanism over the CPU connector on the system board and press it until it clicks into
place.
2. Press the four rivets to secure the retention mechanism. Make sure all four rivets are properly inserted into the
holes on the system board.
Figure 4-18 Installing the Retention Mechanism
3. Remove the Celeron processor from its protective packaging.
4. Attach the heatsink on top of the Celeron processor.
5. Align the fasteners underneath the processor card with the heatsink tabs.
6. Press the heatsink and fasteners together to lock the heatsink.
AcerPower 6100 (V66M/H61) User's Guide
cxiv
Observe ESD precautions when installing or
removing a system component.
4.1.1.
See section

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acerpower 6100

Table of Contents