Contents Of The Rack Server Shipping Carton; Installing Hardware Options; Setting Up A Tower Server - HP ProLiant ML350 User Manual

Generation 5
Hide thumbs Also See for ProLiant ML350:
Table of Contents

Advertisement

UPS

Contents of the rack server shipping carton

Unpack the server shipping carton and locate the materials and documentation necessary for installing the
server. All the rack mounting hardware necessary for installing the server into the rack is included with the
rack or the server.
The contents of the server shipping carton include:
Server
Power cord
Hardware documentation, Documentation CD, and software products
Rack-mounting hardware
In addition to the supplied items, you may need:
T-15 Torx screwdriver
Hardware options
Operating system or application software
PDU

Installing hardware options

Install any hardware options before initializing the server. For options installation information, refer to the
option documentation. For server-specific information, refer to "Hardware options installation (on page
29)."

Setting up a tower server

Follow the steps in this section to set up a tower model server. If you are going to install the server into a
rack, refer to the rack installation
("Installing the server into the
rack" on page 26) section.
Setup 25

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents