Burner Assembly And Lp Conversion; Gas Valve Coils - GE GFDS350 Technical Service Manual

Ha dryer with mist
Hide thumbs Also See for GFDS350:
Table of Contents

Advertisement

Burner Assembly and LP Conversion

The burner assembly consists of the gas valve coils,
gas valve, burner, and inlet pipe.
To convert the dryer from natural gas to LP gas,
install a WE25X217 conversion kit. To convert the
burner assembly back to natural gas, install a
WE25X218 conversion kit.

Gas Valve Coils

The burner assembly has a gas valve that utilizes
3 coils. A double coil (safety and booster coils
combined) and a single main coil are located on top
of the gas valve in front of the combustion chamber
opening. All coils can be replaced separately.
Gas valve coil assembly resistance values:
• Safety coil terminals - 1400 
• Booster coil terminals - 580 
• Main coil terminals - 1300 
To remove the double and main coils:
1. Remove the drum. (See
2. Remove 2 Phillips-head screws from the front
frame and the Phillips-head screw from the rear
of the gas valve cover.
Gas Valve
Moisture
Main Coil
3. Disconnect the wire harness from both coils.
Booster Coil
Safety Coil
4. Note the position of the locator pins inserted in
the coil bracket.
5. Remove the 2 Phillips-head screws that attach
the coil bracket to the valve body.
– 38 –
Drum
Shield
(Continued Next Page)
.)
Disconnect
Disconnect

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gfds355Gfdn240Gfdn245

Table of Contents