Refrigerant Piping - Panasonic CS-F24DB4E5 Service Manual

Air conditioner
Hide thumbs Also See for CS-F24DB4E5:
Table of Contents

Advertisement

Tighten the nuts and bolt to prevent unit from falling.
Warning

10.4.4. Refrigerant piping

Refrigerant is charged to the outdoor unit. For details, see the manual for installation work of outdoor unit.(Additional charging,
etc.)
1. Brazing for piping.
a. Execute brazing before tightening the flare nut.
b. Brazing must be executed while blowing nitrogen gas.
(This prevents generation of oxidized scale in copper pipe.)
2. When there is a lot of brazing for long piping, install a strainer at the midway of the piping.
(The strainer is locally supplied.)
3. Use clean copper pipe with inner wall surface free from mist and dust. Blow nitrogen gas or air to blow off dust in the pipe
before connection.
4. Form the piping according to its routing. Avoid bending and bending back the same piping point more than three times.
(This will result in hardening of the pipe).
5. After deforming the pipe, align centers of the union fitting of the indoor unit and the piping and tighten them firmly with
wrenches.
6. Connect pipe to the service valve or ball valve which is located below the outdoor unit.
7. After completed the piping connection, be sure to check if there is gas leakage in indoor and outdoor connection.
POSITIONS OF AIR CONDITIONER BODY AND CEILING SURFACE
HANGING POSITION OF THE AIR CONDITIONER BODY
54

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents