Burner And Supply Pipe Installation; Burner Installation; Supply Pipe Installation; Burner Checks - Valor 762 Installer And Owner Manual

Blakely fascia
Table of Contents

Advertisement

INSTALLER GUIDE

13. BURNER AND SUPPLY PIPE INSTALLATION

13.1 Burner installation.

1. Remove the 'Aeration checking' reminder label from the top of the burner.
2. Refit the burner unit to the
convection box with the six
screws removed previously.

13.2 Supply pipe installation.

1. A nut and olive is provided for
an 8mm-pipe inlet connection
directly to the gas control. The
isolating 'T' connector can be
rotated to allow a connection
from the rear. The 'T' connector
includes a valve for isolating the
Figure 17. Floor fixing
gas supply.
The supply pipe must be rigid material. Flexible pipe must not be used. Connect the
supply line to the appliance.
2. If closed
open the isolating valve at the inlet 'T' connector.
,
3. Turn on the gas supply and pressure check the installation pipework for gas
soundness. In the United Kingdom (GB) check in accordance with the current edition
of BS 6891. In the Republic of Ireland
check in accordance with the current
edition of IS 813 "Domestic Gas
Installations".
Some burner operations can be checked
at this stage. Checking now will mean
that less disassembly will be required if
any problems are found. A full check
should still be made, however, after
final installation. Only leave the
burner alight long enough to confirm
its operation.

13.3 Burner checks.

Figure 18. Cable locations

13.3.1 Lighting the fire.

If closed
open the isolating 'T' connector valve.
,
Turn the 'manual' knob to the ON, full counterclockwise
position.
©
Page 27
GDC Group Ltd. 2013

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents