CANISTER
3
2
7 Nm (0.7 m
Order
Removing the canister
1
Canister
2
Rollover valve
3
Fuel tank to rollover valve hose
4
Rollover valve to canister hose
5
Canister to throttle body hose
4
kg, 5.1 ft
Ib)
•
•
Job/Part
CANISTER
1
Q'ty
Remove the parts in the order listed.
1
1
1
1
1
For installation, reverse the removal pro-
cedure.
7 - 41
FI
5
Remarks