Husqvarna 16530-XLS Operator's Manual page 6

Husqvarna snow blower user manual
Table of Contents

Advertisement

ASSEMBLY / PRE-OPERATION
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
1. Retrieve vinyl sleeve and spring from bag of parts and
retrieve the auger control rod from carton chute tray.
Slide straight rod end through the small hole in the
vinyl sleeve. Hook spring in hole in rod end.
2. Hook end of spring into control arm with loop opening
up as shown. (See Fig. 5)
3. With top end of rod positioned under right side of
control panel, push down on rod and insert end of rod
into hole in auger control bracket. Secure with retainer
spring.
AUGER
CONTROL
ROD
VINYL
SLEEVE
CONTROL
ARM
AUGER CONTROL ROD
RETAINER
SPRING
LOOP
OPENING
UP
FIG. 5
AUGER
CONTROL
LEVER
AUGER
CONTROL
BRACKET
FIG. 6
INSTALL DISCHARGE CHUTE / CHUTE ROTATER
HEAD (See Fig. 7)
NOTE: The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
1. Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2. Position chute rotater head over chute bracket. If nec es -
sary, rotate chute assembly to align square and pin on un-
der side of chute rotater head with holes in chute brack et.
3. With chute rotater head and chute bracket aligned,
po si tion chute rotater head on pin and threaded stud
of mounting bracket.
4. Install 3/8 washer and locknut on threaded stud and
tighten securely.
CHUTE
ROTATER
HEAD
ALIGN BEFORE
CHUTE
TIGHTENING LOCKNUT
BRACKET
6
3/8 LOCKNUT
3/8 WASHER
THREADED
STUD
ROTATER HEAD
MOUNT ING
BRACKET
FIG. 7
PIN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents