Installation - Husqvarna SMB 70, SMB 70 E Operator's Manual

Husqvarna chain saw operator's manual
Table of Contents

Advertisement

Unpacking
Unpack the one-man sawmill and check that the
delivery is complete. Check that no parts are
damaged. If any part is damaged, report this to
the carriers.
The operator's manual includes detailed instruc-
tions about safety, assembly, use, and mainte-
nance of the one-man sawmill.

Installation

Installation Site
The one-man sawmill with petrol engine should
be installed outdoors.
There should be space to lay out timber and
sawn wood.
Rails
Place the rail sections after each other on the
transverse wooden beams, which are placed
under each log bolster, and an extra transverse
wooden beam by the joints between the sections.
FIG. 18
Aligning the rails
FIG. 19
Adjustable foot
16
–English
INSTALLATION
Parts that are included are pictured in the De-
scription section on page 7-10 . Component parts
are packed according to the following:
1.
Rail sections (quantity according to the order).
2.
Split saw carriage with engine/motor.
3.
4 rail guards.
4.
Bandsaw blade.
5.
Tanks with hoses.
6.
Assembly components.
Continue as follows:
1. Assemble the adjustable feet under each of
the 16 log bolsters. Adjust, by using the
adjustable feet and the rails' bedding, until
the rail sections form a straight line and the
rails sit firmly on each wooden beam. See
FIG. 18.
2. Loosely bolt together the rail sections using
the supplied jointing plates and M12 nuts and
bolts. See FIG. 20.
3. Finely adjust the rails and tighten all the
bolts. Tighten the bolted joints to 5-10 Nm.
See FIG. 18.
4. Fit the stops to the ends of the rails (see page
14, FIG. 11), as well as the folding stops, log
lift, and log lock (see page 13, FIG 10).
5. Load the rails above each wooden beam and
check that the rails do not move.
FIG. 20
Bolted joint

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Horizont ii

Table of Contents