Cable Adjustment - Bowflex Ultimate 2 Assembly Instructions Manual

Table of Contents

Advertisement

21
STEP 19
Parts:
• Squat Frame
• Shoulder Bars
Tool:
• Hex Key (3/16") and (5/32")
• Wrench (1/2") & (7/16") - or Adjustable Wrench
19-1 Position Shoulder Bars against back of
Squat Frame with bend in arms pointing
towards the front of the frame.
19-2 Install and completely tighten the side screws,
washers and hex nuts.
19-3 Align holes in Lock Pin Assembly and
Squat Frame.
19-4 Install and completely tighten Lock Pin
Assembly hardware.
Hardware (1:1):
4 Button Head Screws (5/16" X 1 3/4")

Cable Adjustment

The Release Cable should be adjusted so
that there is enough tension to keep the
cable from laying on the metal frame. In
most cases this adjustment will be fi ne out
of the box. If the cable needs adjustment,
loosen the locknut and turn the Adjusting
Barrel counter-clockwise until cable is taut
The release cable may stretch with use.
Check the cable tension regularly and
adjust if needed.
Assembling Your Bowflex Ultimate
Left Shoulder Bar
5/16" Hex Nut
1/4" Hex Nut
8 Washers (5/16")
Release Cable
Right Shoulder Bar
(has handle and cable)
Washer
Lock Pin Assembly
4 Hex Nuts (5/16")
Lock
Nut
2
Button Head Screw
(1/4" x 3/4")
Squat Frame
Side Screw
Button Head (5/16" x 1 3/4")
Adjusting Barrel
Metal Frame

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents