Top Link Bracket Device; Structure; Operation - Cub Cadet 8354 Service Manual

Hide thumbs Also See for 8354:
Table of Contents

Advertisement

CHAPTER 9
8354/8404

11. TOP LINK BRACKET DEVICE

11.1 STRUCTURE

(1) Top Link Holder
(2) Flange
(3) Cover
(4) Spring
(5) Nut

11.2 OPERATION

If shock is applied to the implement, it will be absorbed
by cover (3), spring (4), and top link and connected to
linkage by plate (7) and tie rod (9) to elevate the imple-
ment.
This time, the oil flow passage will be changed by link-
age in the MLS valve.
9-20
K&T Saw Shop 606-678-9623 or 606-561-4983
www.mymowerparts.com
(6) Hex. Bolt
(7) Plate
(8) Crank
(9) Tie Rod
(10) MLS (Control) Valve
615W924A
D615-W02 May-2003

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

8404

Table of Contents