andrews CSC39 Installation Manual, Operation And Service Manual page 25

Natural gas, propane & butane fired storage water heaters
Table of Contents

Advertisement

SECTION 3
WATER
CONNECTIONS
UNVENTED
SYSTEMS
Fig 11.
22
INSTALLATION
Unvented Systems should be fitted by an Approved Installer
When used in an unvented system, the Andrews water Heater will supply hot water at a
pressure of 3.5bar (51lbf/in
During conditions of no-flow, system pressure may rise to a maximum of 6bar (87lbf/in
whilst the burner is operating. When testing the system, it is recommended that a
maximum test pressure of 8.6bar (125 lbf/in
The heater can be used on unvented hot water storage systems, with the addition of an
Unvented Systems Kit, part number B228 available from Andrews Water Heaters.
See Parts List Page 37. The Wall mounting assembly is available as an optional extra.
C5
Temperature/
Pressure
Relief Valve
C6
1
" Sq Tee
1
2
Cold Water
Inlet of
Water Heater
C2 Check Valve/
C3 Expansion Valve
C7 Tundish
Item C5 must be fitted into C6 and fitted on the hot water outlet nipple (See fig.12).
When assembling items C1 and C2, ensure that the flow arrows marked on the components
are pointing in the direction of flow, i.e. towards the water heater.
The cold water for services may be drawn from the 22mm compression port on item C1(a).
The water pressure at this point will be similar to that available at the hot water outlet of
the water heater. If port (a) is not used, it should be sealed with the blanking plug supplied.
), provided that this pressure is available at the mains feed.
2
2
)is employed.
OPTIONAL PARTS
C4
(a)
C1 Pressure Reducing
Valve / Strainer
Balance Cold Water
Take-off
(if required)
C9
Wall bracket Assembly
C8
Hose Assembly
Cold Water Inlet
NB. Tees, elbows, stop valves and
pipework not supplied.
)
2

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csc59Csc78Csc93Cscl39Cscl59Cscl78 ... Show all

Table of Contents