Horizontal Installations; Sequence Of Operation; (Integrated Ignition Control); Normal Heating Sequence - Amana AMV8 Installation Instructions Manual

Tw-stage gas-fired warm air furnace
Table of Contents

Advertisement

Minimum Filter Sizes
Furnace Input
45M
68M
90M
115M
135M
45M
68M
90M
115M
135M
Permanent Nominal 600 F.P.M.
Disposable Nominal 300 F.P.M.
H
I
ORIZONTAL
NSTALLATIONS
Filters must be installed in either the central return register or in
the return air duct work.
XI. SEQUENCE OF OPERATION

(INTEGRATED IGNITION CONTROL)

Refer to Timing Charts for sequencing.
The normal power up sequence is as follows:
• 115 VAC power applied to furnace.
• Integrated control module performs internal checks.
• Integrated control module flashes LED lights.
• Integrated control module monitors safety circuits
continuously.
• Furnace awaits call from thermostat.
N
H
S
ORMAL
EATING
EQUENCE
• R and W1 (or R and W1/W2) thermostat contacts close,
initiating a call for heat.
• Integrated control module performs safety circuit checks.
• Induced draft blower is energized on high speed for a 15-
second prepurge. Humidifier terminals are energized with
induced draft blower.
• Induced draft blower steps to low speed following
prepurge. Low stage pressure switch contacts are closed.
• Igniter warm up begins upon step to low speed and
presence of closed low stage pressure switch contacts.
• Gas valve opens at end of igniter warm up period,
delivering gas to burners and establishing flame.
• Integrated control module monitors flame presence. Gas
valve will remain open only if flame is sensed.
• If the thermostat call is for low heat, gas valve and induced
draft blower will continue on low stage. If the call is for high
heat, the gas valve and induced draft blower will change to
high stage.
• Circulator blower is energized on the appropriate heat
speed following a fixed thirty second blower on delay. The
circulator blower requires 30 seconds to ramp up to full
speed. Electronic air cleaner terminals are energized with
circulator blower.
• Furnace is now operating on the specified stage called for
by the two-stage thermostat.
• Furnace runs, integrated control module monitors safety
circuits continuously.
• If the two-stage thermostat changes the call from low heat
to high heat, the integrated control module will immediately
switch the induced draft blower, gas valve, and circulator
blower to their high stage settings.
2
Type
Filter Size (in
)
160
Permanent
241
Permanent
320
Permanent
400
Permanent
370
Permanent
320
Disposable
483
Disposable
640
Disposable
800
Disposable
738
Disposable
• If the two-stage thermostat changes the call from high heat
to low heat, the control will immediately switch the induced
draft blower and gas valve to their low stage settings. The
circulator blower will remain on high heating speed for
thirty seconds before switching to the low heat circulating
speed.
• R and W1 (or R and W1/W2) thermostat contacts open,
completing the call for heat.
• Gas valve closes, extinguishing flame.
• Induced draft blower is de-energized following a fifteen
second post purge. Humidifier terminals are de-energized.
• Circulator blower continues running for the selected heat
off delay period (90, 120, 150 or 180 seconds). The speed
run during this period depends on the last heat call provided
by the thermostat.
If the last call for heat was a call for high heat, the air
circulating motor will run on the high heating speed for
thirty seconds and then switch to the low heating speed for
the balance of the heat off delay period
• Electronic air cleaner terminals is de-energized
• Circulator blower ramps down to OFF during the 30
seconds following the heat off delay period.
• Furnace awaits next call from thermostat.
N
C
S
ORMAL
OOLING
EQUENCE
• R and YLO/G or Y/G thermostat contacts close, initiating a
call for cool.
• Integrated control module performs safety circuit checks.
• Outdoor fan and compressor are energized to their
appropriate speed.
• Circulator blower is energized on the appropriate cool
speed following a fixed five second on delay. The circulator
blower requires 30 seconds to ramp up to full speed.
Electronic air cleaner terminals are energized with
circulator blower.
• Furnace circulator blower and outdoor cooling unit run their
appropriate speed, integrated control module monitors
safety circuits continuously.
• R and YLO/G or Y/G thermostat contacts open, completing
the call for cool.
• Outdoor fan and compressor are de-energized.
• Circulator blower continues running for a cool off delay
period. The OFF delay time and airflow level are
determined by the selected ramping profile.
• Electronic air cleaner terminals and circulator blower are
de-energized.
• Furnace awaits next call from thermostat.
C
F
ONSTANT
AN
• R and G thermostat contacts close, initiating a call for fan.
• Integrated control module performs safety circuit checks.
• Circulator blower is energized on continuous fan speed
(56% of high stage cooling) following a five (5) second
delay. Electronic air cleaner terminals are energized.
• Circulator blower runs, integrated control module monitors
safety circuits continuously.
• R and G thermostat contacts open, completing the call for
fan.
• Circulator blower is de-energized. Electronic air cleaner
terminals are de-energized.
• Furnace awaits next call from thermostat.
23
- I
I
C
NTEGRATED
GNITION
ONTROL