Figure 2-3 Video Selection Switch Sw1 And Wiring P1, P2, And P3 Locations - Honeywell ACUIX ES Installation And Configuration Manual

Ptz analog dome
Hide thumbs Also See for ACUIX ES:
Table of Contents

Advertisement

Installing the ACUIX ES
BNC Connector
SW1 Video Selection
ON = UTP Video Enabled
OFF = COAX Video Enabled
30
Figure 2-3
Video Selection Switch SW1 and Wiring P1, P2, and P3 Locations
Power and Data Wiring Plug P1
P1
The base of the pendant, surface
mount or in- ceiling housing and scan
assembly has these switches and
plugs. Shown is the pendant or
surface mount. See
page 43
example of the in-ceiling.
Contact Wiring Plugs P2 and P3
P3
P2
for an

Advertisement

Table of Contents
loading

Table of Contents