Window Installation Instructions - GE AG_18 Owner's Manual & Installation Instructions

Ge 18,000/24,000 btu room air conditioners - owner's manual & installation instructions
Table of Contents

Advertisement

Window Installation Instructions.

3
Remove the Air Conditioner From the Case
Remove the 2 shipping screws from the back of
A
the case.
Remove the 2 screws on each side of the case.
B
Keep these for later use.
4
Prepare the Window and the Case
Cut the window sash seal to the proper length.
A
Peel off the backing and attach the seal to the
underside of the window sash.
Carefully insert the plastic frame guides into
B
the bottom of the case on each side.
Bottom of case
12
Slide the air conditioner from the case by
C
gripping the base pan handle and pulling
forward while bracing the case.
Shipping screws
Shipping screws
Remove the backing from the top mounting
C
rail seal strip and attach the seal to the bottom
of the top mounting rail.
Install the top mounting rail with 3 type A
D
screws on the inside of the case. Insert the
frames for the accordion panels into the top
mounting rail and the frame guides. Attach
the accordion panels to the side of the case
using 5 type A screws.
Top mounting rail
Frame guide
12
Frame guides

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ag_24

Table of Contents