Power and Cooling
This chapter describes the Cisco NCS 6008 chassis power and cooling systems. It also provides the
power, grounding, and cooling requirements for the installation site to help you plan the site facilities
for the system.

Chassis Power System

The Cisco NCS 6008 chassis can be either AC-powered or DC-powered.Each type of power system
supports N+N redundancy for all feeds and power system components. The chassis contains six power
trays of either type. An AC power tray contains up to three AC PMs. A DC power tray contains up to
four DC PMs.
The PMs will load-share across input power feeds. The load is balanced across all input feeds.
Each AC PM requires its own single-phase AC input power feed. If you have 3-phase AC-Delta or
AC-Wye at your equipment, a Cisco NCS 3-Phase AC PDU is required to convert a 3-phase AC input
power feed to three single-phase AC input power feeds.

General Power and Grounding Requirements

This section describes the power and grounding requirements you must consider when planning the site
facilities for the routing system. In addition, see the
Power Systems" section on page 2-7
chassis type.
OL-29236-02
Chassis Power System, page 2-1
General Power and Grounding Requirements, page 2-1
Bonding and Grounding Guidelines, page 2-2
DC Power Systems, page 2-4
AC Power Systems, page 2-7
Chassis Cooling System, page 2-16
Facility Cooling Requirements, page 2-17
Cisco Network Convergence System 6000 Series Routers Site Planning Guide
C H A P T E R
"DC Power Systems" section on page 2-4
for additional information about the power requirements for your
2
or the
"AC
2-1

Advertisement

Table of Contents
loading

Table of Contents