Power Control Procedure - Motorola MVME956AC User Manual

Vme chassis
Table of Contents

Advertisement

Operating Procedures

Power Control Procedure

3
3-2
A suggested power-on procedure for the chassis is as follows:
1. Ensure that all modules and cabling are properly configured and
installed. Also check that all required external cabling (to
peripherals) is correctly installed.
2. Plug in the AC line cord (at the rear of the chassis) and connect the
cord to an AC power source.
3. Set the power switch at the front of the chassis to (ON). The power
supply cycles up and the cooling fans immediately come on.
4. Power up any peripheral equipment interfaced to the chassis that has
its own power on/off switch.
A suggested power-off sequence for the chassis is as follows:
Note
Ensure that proper software shutdown procedures have been
executed before you continue.
1. Power down any peripheral equipment interfaced to the chassis that
has its own power on/off switch.
2. Set the power switch to OFF. The power supply cycles down, and
the cooling fans stop running. For the AC chassis only, the power
supply fan will continue to run.
Computer Group Literature Center Web Site

Advertisement

Table of Contents
loading

Table of Contents