Page 1
• More radiating surface than a cylindrical shape construction heater. • One bolt removes burner and all controls. Construction Heater Models: CH 220 with 10’ hose CH 225 with 25’ hose CH 250 with 50’ hose PLUS…...
Page 2
OPERATING INSTRUCTIONS FOR THE “Hot Box” RED DRAGON CH 220, CH 225 and CH 250 CONSTRUCTION HEATERS Note: Unpack and inspect for damage. Retain this information sheet for future reference after reading thoroughly. DO NOT use this heater in a space where gasoline or other liquids having flammable vapors are stored or used.
Page 3
OPERATING INSTRUCTIONS FOR THE “Hot Box” RED DRAGON CH 220, CH 225 AND CH 250 CONSTRUCTION HEATERS Note: The “HOT BOX” is intended for the temporary heating of buildings under construction, alteration or repair. Use only in a well-ventilated area.
Page 4
RED DRAGON CH 220, CH 225 AND CH 250 CONSTRUCTION HEATERS Questions? If you have any questions about the operations of the CH 220, CH 225 or CH 250 call your local distributor or Flame Engineering, Inc. at 1-800-255-2469 or fax 785-222-3619.