Concluding Steps - Fujitsu PRIMERGY RX200 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX200 S8:
Table of Contents

Advertisement

System board and components
Figure 220: Tools for breaking the UFM
Figure 221: UFM breaking method
Ê Use a long nose pliers and a combination pliers to break the UFM in
half as shown in the figure.

15.3.2.3 Concluding steps

"Installing the riser module 3" on page 61
Ê
"Reassembling" on page 52
Ê
"Connecting the server to the mains" on page 57
Ê
"Enabling SVOM boot watchdog functionality" on page 78
Ê
"Switching on the server" on page 58
Ê
"Enabling BitLocker functionality" on page 83
Ê
286
Upgrade and Maintenance Manual
RX200 S8

Advertisement

Table of Contents
loading

Table of Contents