Installing A Memory Module; Preliminary Steps; Selecting The Memory Slot - Fujitsu PRIMERGY RX200 S8 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY RX200 S8:
Table of Contents

Advertisement

– In order to satisfy cooling requirements, populate memory channels on
alternating sides of the processor:
Order
1
2
3
4
10.2

Installing a memory module

Upgrade and Repair Unit
(URU)
Tools: tool-less

10.2.1 Preliminary steps

"Disabling SVOM boot watchdog functionality" on page 64
Ê
"Disabling BitLocker functionality" on page 63
Ê
"Shutting down the server" on page 46
Ê
"Disconnecting the server from the mains" on page 47
Ê
"Getting access to the component" on page 47
Ê
"Removing the air duct" on page 62
Ê

10.2.2 Selecting the memory slot

Ê Choose the memory slot according to the configuration rules in
information" on page
RX200 S8
CPU 1
Channel A
Channel C
Channel B
Channel D
196.
Upgrade and Maintenance Manual
Main memory
CPU 2
Channel E
Channel G
Channel F
Channel H
Hardware: 5 minutes
"Basic
205

Advertisement

Table of Contents
loading

Table of Contents