Verifying Operation - Brocade Communications Systems Brocade VDX 6740 Hardware Reference Manual

Top-of-rack, gigabit ethernet (gbe) line-rate, low latency, lossless data center bridging (dcb) switches
Table of Contents

Advertisement

NOTE
Power is supplied to the switch as soon as the first power supply is connected and powered on.
3. After POST is complete, verify that the switch power and status LEDs on the port side of the

Verifying operation

After you have powered the system on and POST is complete, verify that the switch is working
properly.
1. Verify that the power supply LEDs are solid green. Refer to
2. Verify that the system power LED and the system status LED is solid green. Refer to
3. The port LEDs should be lit during POST activities. When POST is complete, only the LEDs for
Refer to
Brocade VDX 6740 Hardware Reference Manual
53_1002829_02
switch are green.
location of these LEDs.
and
Figure 7
and for the specific locations of these LEDs.
ports connected to other devices should be green. Refer to
specific locations of these LEDs.
Table 3
for more details on the LED patterns.

Verifying operation

Figure 9
and
Figure 10
for the
Figure 7
Figure 7
and
Figure 7
for the
2
11

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vdx 6740Vdx 6740tVdx 6740t-1g

Table of Contents