System Power Requirements - Motorola MSAT-G2 Installation Manual

Mobile satellite radio
Table of Contents

Advertisement

System Power Requirements

There is only one power connection for the entire radio. This must be connected to a
12 VDC power supply.
Power requirements and consumption are as follows:
Voltage Input Minimum
Voltage Input Maximum
Total Current for AU,TU & Handset (Max.)
Required Fuse
MSAT-G2 Installation Guide
Figure 9 – Transceiver Unit Front & Back
Figure 10 – System Power Requirements
11.5 V DC
15.6 V DC
3A
5A
7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents