Hardware Installation; Front Panel - Netis DL4311 User Manual

Adsl2+ modem router
Hide thumbs Also See for DL4311:
Table of Contents

Advertisement

IP QoS
Dynamic DNS
UPnP support
System log support, can record the state of the router
Remote management
SNMP v1/v2/Trap
Firmware upgrade through FTP, TFTP and HTTP
Configuration backup/restore
Diagnostic tools

2. Hardware Installation

2.1 Front Panel

The front panel of the wireless ADSL2+ Modem Router includes one power indicator and eight
function indicators, as explained in table below:
LED
Status
On
Power
Off
Green
Internet
Off
Red
On
DSL
Blink
On
LAN(1-4)
Power is on
Power is off
A successful PPP connection has been built
The ADSL port is linked down or the Modem Router works in Bridge
mode
The PPP connection failed to be established
The ADSL port is linked up
The ADSL port is linked down
There is a successful connection on the corresponding LAN port
3
ADSL2+ Modem Router User Manual
Indication

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents