Standard Maintenance - AEG VCR 4500 Service Manual

Hide thumbs Also See for VCR 4500:
Table of Contents

Advertisement

Service Schedule of Components
This maintenance chart shows you the standard of replacement and cleaning time for each part.
Because those may replace depending on environment and purpose for use, use the chart for reference.
Ref.No.
B2
Cylinder Assembly
B3
Loading Motor Assembly
Pulley Assembly
B8
B587
Tension Lever Assembly
B31
ACE Head Assembly
B573, B574
Reel S, Reel T
B37
Capstan Motor
Cap Belt
B52
FE Head
*B73
*B86
F Brake Assembly (HI)
B133
Idler Assembly (HI)
B410
Pinch Arm Assembly
B414
M Brake (SP) Assembly (HI)
M Brake (TU) Assembly (HI)
B416
B525
LDG Belt
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / ACE Head / FE Head) using
90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording model only
* B86 ------ Not used in 2 head model.

STANDARD MAINTENANCE

Deck
Part Name
H: Hours
Periodic Service Schedule
1,000 H
2,000 H
I
I
I
I
I
I
I
I
I
I
I
2-1-1
: Cleaning
I: Replace
3,000 H
4,000 H
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
U29PHSMEN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents