Download  Print this page

Advertisement

Table of Contents
Basics of Assembly
1
Attachment of Spring
1. Attach the spring 1.
*Key point
• Hang the section 2 of the spring 1 on the positioning hole of
the upper shaft bearing presser 3, and hang the section 4 on
the notch part 5 of the base plate assy. and hang the section
6 on the tension pulley holder 7.
2
Attachment of Main motor assy
1. Hang the motor belt 3 on the gear part of the main motor assy. 1 and the
T pulley 2.
2. Set the main motor assy. 1 to the rear cover assy., and then temporarily
tighten the 2 screws 1 and the 2 washer EX tooth 5 4.
*Key point
• Fully tighten the screw 1 after performing "4-5 Adjustment :
Motor belt tension".
→ Refer to 3 - 61 "Assembly of Main motor assy".
1
Electrical parts and motors
Giza Tite
M5X16
Hand start
1
Torque
6
7
2
3
4
5
2
3
1, 4
1
2 - 25

Advertisement

Table of Contents

   Related Manuals for Brother CE-5500PRW

Comments to this Manuals

Symbols: 0
Latest comments:
  • Debbie Doebley Sep 04, 2018 10:52:
    I have the Brothers sewing machine CP6500, only got Spanish manual with the machine and I do not speak, etc Spanish. I was sewing with my machine then had to change the tension and now I am having a lot of trouble getting it to work properly again, thread from bobbin bunches up(?), Is there any way I can get the manual in English so I can try to get my machine working properly again? I would really appreciate any help you can give me. If need to you can email @ debbiedoeb​ley@aol.co​m. My home address is 3122 Belgreen Place, Philadelph​ia, Pa 19154. Thank You!