5
5-1
Purpose
Operation test/Check
Function
Used to check the operation of the display, LCD in
(Purpose)
the operation panel, and control circuit.
Section
Operation (Display/Operation key)
Item
Operation
Operation/Procedure
The LCD is changed as shown below. (The contrast changes
every 2sec from the current level to MAX
level. During this period, each LED is lighted.
SIMULATION 5-1
After 6.0sec
SIMULATION 5-1
5-2
Purpose
Operation test/Check
Function
Used to check the operation of the heater lamp
(Purpose)
and the control circuit.
Section
Fixing (Fusing)
Item
Operation
Operation/Procedure
1) Select the number corresponding to the target of operation
check with 10-key.
2) Press [START] key.
The load selected in procedure 1 performs ON/OFF operation.
Press [CUSTOM SETTINGS] key to stop the operation of the
load.
The ON/OFF operation of the selected heater lamp is
repeated every 500ms five times.
1
HL1 (LOWER)
Heater lamp 1 (Lower)
2
HL2 (UPPER)
Heater lamp 2 (Upper)
SIMULATION 5-2
HEATER LAMP TEST. SELECT 1-2, AND PRESS START.
1.HL1(LOWER)
2.HL2(UPPER)
Press [START] key, and the
operation is started.
SIMULATION 5-2
HEATER LAMP TEST. EXECUTING···.
1.HL1(LOWER)
2.HL2(UPPER)
MIN
the current
Press [CUSTOM SETTINGS] key,
and the operation is stopped.
2
Press [CUSTOM SETTINGS] key, and
the operation is stopped.
The operation is repeated the specified
number of times before stopping.
2
AR-M351U/M451U, AR-M355U/M455U SIMULATION 9 - 12
5-3
Purpose
Operation test/Check
Function
Used to check the operation of the scanner lamp
(Purpose)
and the control circuit.
Section
Optical (Image scanning)
Item
Operation
Operation/Procedure
1) Select the number corresponding to the target of operation
check with 10-key.
2) Press [START] key.
The load selected in procedure 1 turns ON for 10sec.
Press [CUSTOM SETTINGS] key to stop the operation.
The copy lamp or CIS is turned on for 10sec and turned off.
NOTE: CIS: only when the DSPF is installed.
SIMULATION 5-3
COPY LAMP TEST. SELECT 1-2, AND PRESS START.
1.COPY LAMP
2.CIS
Press [START] key, and the operation
is started.
SIMULATION 5-3
COPY LAMP TEST. EXECUTING···.
1.COPY LAMP
2.CIS
6
6-1
Purpose
Operation test/Check
Function
Used to check the operation of the paper transport
(Purpose)
system loads and the control circuit.
Section
Paper transport (Discharge/Switchback/Transport)
Item
Operation
Operation/Procedure
1) Select the number corresponding to the target of operation
check with 10-key.
2) Press [START] key.
The load selected in procedure 1 operates.
Press [CUSTOM SETTINGS] key to stop the operation.
1
MSWPR
MSW power relay signal
2
HLPR
Heater power relay
3
DCPR
DC power relay
4
MM
Main motor
5
DM
Drum motor
6
POM_FW
Paper exit motor forward rotation
7
POM_RV
Paper exit motor reverse rotation
8
CPFC
Paper feed clutch
9
RRC
Resist roller clutch
10
TRC
Transport roller clutch
11
FGS_FIN
Finisher gate solenoid
12
LUM
Tray 1 lift-up motor
13
TRC_DSK
Desk clutch sync signal
14
PSPS
Separation pawl solenoid
15*1
MCM
MP drive motor control signal
16*1
MCPCL
MP tray paper feed clutch signal
17*1
MCFCL
MP tray transport clutch signal
1
Press [CUSTOM SETTINGS] key, and
the operation is stopped after 10sec.