Sharp SF-2014 Service Manual page 68

Table of Contents

Advertisement

6)
Without moving the scanner unit drive pulley shaft, man-
ually turn the scanner nit drive pulley in the same side of
the loosened setscrew. When it makes contact with No.2
scanner unit positioning plate, tighten and fix the setscrew.
Do not move
the shaft.
No.2 scanner unit
Positioning plate
Scanner unit drive pulley
(Note)
Allow a clearance of about 0.5mm between the scanner
unit drive pulley and the positioning E-ring.
0.5mm
7)
Manually turn the scanner unit drive gear to bring No.2
scanner unit into contact with the positioning plate, and
perform the procedure of step 4).
Repeat procedures of steps 4) to 7) until the parallelism of
No.2 scanner unit is properly set.
8)
With No.2 scanner unit being in contact with No.2 scanner
unit positioning plate, and insert the 1.0 mm spacer be-
tween No.1 scanner unit and upper-R frame, bring No.1
scanner unit into contact with upper-R frame, and fix it to
the scanner unit drive wire.
No.1 scanner unit
Upper-R frame
Wire fixing
screw
Wire fixing
1.0mm spacer
screw
7 – 10
Procedures 1) to 8) are for adjustment of mechanical hori-
zontal parallelism. No.1 scanner unit and No.2 scanner unit
are fixed to the specified positions and the mechanical hori-
zontal parallelism of No.2 scanner unit is adjusted.
Then the optical horizontal parallelism must be adjusted in
the following procedures.
9)
Set the image distortion check chart on the document table,
and make a reduction copy (90%) on an B4 or 14" x 8 1/2"
paper with the document cover open.
50mm
B4 or "11 x 14" size
paper

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sf-2114Sf-2214

Table of Contents