Transfer Section; Detaching And Refitting The Transfer Roller Unit - Kyocera KM-3050 Service Manual

Hide thumbs Also See for KM-3050:
Table of Contents

Advertisement

1-5-6

Transfer section

(1) Detaching and refitting the transfer roller unit

Follow the procedure below to replace the transfer roller unit.
Procedure
1. Open the left cover 1.
2. While holding down the projection, slide the
transfer roller unit toward the front to remove
it.
3. Replace the transfer roller unit and install
the unit.
2GN/2GP/2GR
Transfer roller unit
Projection
Figure 1-5-56
1-5-27

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Km-5050Km-4050

Table of Contents